Thermo Electric successfully delivered this project together with our local agent and former sister company Doedijns Middle East. We were selected from a number of suppliers who bided on this project to manufacture and supply Thermocouples including Thermowells for off-shore purposes.
Once again we proved our engineering capabilities by performing vibration calculations according to ASME PTC19.3 TW-2010. We also advised and collaborated with the EPC company McDermott accordingly throughout the design stages in order to ensure we met and exceeded the high standards set by Saudi Aramco.
One of the challenges on this project was the change in specifications midway through. These specifications were changed during the manufacture process, such as flange sizes, immersion lengths and painting requirements. We dealt with all change requests accordingly and the Thermocouples and Thermowells arrived on-site, on time, ready for installation.